Posts Tagged: John McGilvray

It has been a full four weeks since my last update on the progress on our home. After many tedious punch list items, we are fully complete inside, and have moved back in. Home Choice came through! Marvin Windows sent one of their factory technicians to go through the entire house and tweak everything. They

Read more »

Progress is moving a little slowly since the last post…..but the work that has been done is amazing!  We have our new tv cabinet in the office 90% installed…..minus about two days worth of electronics installation.  At this point, in my opinion, BIGGER IS BETTER!  Wow!  What a difference 17′ of glossy black cabinetry can

Read more »

LOTS of progress over the past week.  The mess seems to have grown today….but that is part of the progress.  Great strides have been made in the former office space.  The random width V-groove ceiling is completely installed, and the painting is well under way.  We have crown molding now in the office space, and

Read more »

Lots of great progress today! The first “layer” of parquet was pulled up in the den. Evidently, the way this product was produced, there was a thin layer of wood over a plywood base……and this thick layer of black tar that joined the two together. It went down in one piece, but it comes up in two! Tonight, we have the black tar layer exposed, and tomorrow that should be gone.

Read more »